|
Bookman Stacks Condominiums; Minneapolis, MN
 |
- Utilizing the ER-POST™ System (Patent Number 7010890)
- A new 99,000 square foot eight story housing tower
- A two story parking facility below the housing
- This structure was erected in four weeks.
- We also provided all precast engineering, design and detailing.
- View Enlarged Image >>
|
Cobalt Condominiums; Minneapolis, MN (currently under construction)
 |
- Utilizing the ER-POST™ System (Patent Number 7010890)
- A new nine story condominium tower along University Ave with a total area of 134,000 square feet.
- A five story condominium tower along Central Avenue with a total area of 30,000 square feet.
- A 42,000 square foot one story retail center located at grade above a one level parking garage.
- A three story parking facility with approximately 70,000 square fee
- The superstructure is constructed with precast/prestressed elements
- We also provided all precast engineering, design and detailing.
- View Enlarged Image >>
|
Minnesota State Fair Grandstand; St. Paul, MN
- Addition of a precast elevator enclosure and walkway
- Extension of grandstand seating
- Two multi-level precast exiting facilities containing stairs and walkways
- We also provided all precast engineering, design and detailing.
Providence Academy, Plymouth, MN
- Phase 2; a 69,000 square foot three-story addition
Galleria Parking Ramp; Edina, MN (currently in design)
- A new freestanding 4 level ramp with 1 level below grade
- 755 parking spaces
- Designed for one level of future expansion
- A total precast structure
|