Galleria Parking Ramp; Edina, MN
 |
- A new freestanding 5 level ramp connecting the Westin Galleria Hotel with the Galleria Shopping Mall
- 1,000 stalls
- A total precast structure
- View Enlarged Image >>
|
IKEA Store Parking Ramp; Bloomington, MN
 |
- 110,000 SF elevated public parking deck with an open stairway to on grade asphalt parking
- 320 car capacity
- Precast structure
- Constructed in four months
- View Enlarged Image >>
|
Guthrie Theater Parking Ramp; Minneapolis, MN
 |
- 1,000 car ramp with two levels below grade and six levels above grade
- Designed to comply with the City of Minneapolis design standards
- A post-tensioned concrete structure
- Two skyway bridges and a tunnel connecting to the Theater
- The ramp also supports the Scene Shop on the top level
- View Enlarged Image >>
|
Station 73 Transit Center - Precast Ramp; Plymouth, MN
 |
- One level of slab on grade parking and three levels of elevated public parking deck
- 26,800 SF on levels two and three with 13,700 SF on the fourth level
- Includes stairs to grade with an additional enclosed stair, elevator, and lobby areas.
- View Enlarged Image >>
|
University of St. Thomas, Anderson Parking Facility; Saint Paul, MN
 |
- A five level, 725-stall parking ramp with one level below grade
- Designed to accommodate two levels of future expansion
- The exterior features the latest in precast concrete technologies to simulate the look of brick and stone accented by glass enclosed staircase towers.
- The top level houses an observatory with a high-power telescope utilitzed by the Physics Department.
- View Enlarged Image >>
|
Park Nicollet Frauenshuh Cancer Center Parking Ramp; Saint Louis Park, MN
 |
- A six level, 1,700 car post-tensioned ramp with all levels above grade
- Includes an enclosed stair tower on the northwest corner and a stair elevator tower at the southeast corner adjacent to the connecting link to the new Cancer Center
- Designed for three future levels, and capacity to add an additional 1,000 cars
- View Enlarged Image >>
|
Hellmuth and Johnson Law Offices with Parking Ramp; Edina, MN
 |
- A 35,000 SF office building on a tight 2.4 acre parcel of land fronting I-494
- Three stories of above-ground parking
- Topped by two stories of legal offices
- The high water table on the lot prohibited excavation for underground parking
- The structure is built entirely upon pilings and grade beams
- The project had to pass a rigorous review by the Nine Mile Creek Watershed District, and also needed to obtain a height variance from Edina city officials because of the unusual parking setup
- View Enlarged Image >>
|
Twin Cities Orthopedics Medical Office Building and Parking Ramp; Edina, MN
 |
- A five-level, 125,000 SF above ground parking ramp which was designed to look like a second office building.
- Connected to the new 75,000 SF, four-story medical office building
- View Enlarged Image >>
|
|